22.01.2013

Boiler and Steam Turbine Hall - Looking North
Boiler  - Looking West
Boiler  - Looking East
Boiler - Installation of Header

Boiler Area 1

Steam Turbine Hall - Looking West
Steam Turbine Hall - Looking East

Steam Turbine Hall - Installation of Grating
Steam Turbine Hall - Annex

Central Electrical Building - Looking West
Central Electrical Building - Looking East

Central Electrical Building - Gnd Flr
Central Electrical Building - 1st Flr

Central Electrical Building - 2nd Flr
GSU Trafo Foundation - Looking East

Boiler Electrical Building
Fabric Filter Plant - South Side
Fabric Filter Plant - West Side
MCW Pipeline South of Turbine Hall

MCW Pipe Trench North of New HV Line
MCW & GRP Pipes South of New HV Line

MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond

FGD Ducts and ID Fans Foundation
FGD Ducts and ID Fans Foundation
Demin Plant & Tanks
Industrial Waste Water
Bottom Ash Silo Piling
Aeration Basin

U/G Electrical Ducting - West of Fabric Filter
U/G Electrical Ducting - West of STG