21.01.2013

Boiler and Steam Turbine Hall - Looking North
Boiler  - Looking West
Boiler  - Looking East
Boiler - Installation of Header
Steam Turbine Hall - East Side
Steam Turbine Hall - West Side
Central Electrical Building - Looking West

Central Electrical Building - Looking East

Boiler Electrical Building
Fabric Filter Plant

MCW Pipeline South of Turbine Hall
MCW Pipe Trench North of New HV Line
MCW & GRP Pipes South of New HV Line
MCW & GRP Pipes South of New HV Line
MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond

MCW Pipe Trench at Reclaimed Existing 5 yr Ash pond

Bottom Ash Silo Piling
Industrial Waste Water
Aeration Basin
FGD Duct Foundation and ID Fans
FGD Ducts
U/G Electrical Ducting - West of STG