Chimney - Looking East
Phase2_SWFGD_GRP-West of Chimney - Looking Southeast
Screening House-Excavation - Looking North
Coal Belt Conveyor from Screening House to Coal Trasnfer Tower to Boiler - Looking North
Boiler Electrical Building - Looking Northwest
ID Fans East Side- Excavation - Looking South
Fabric Filter -West Side- Looking Southeast
Boiler Electrical Building - Looking North
Boiler - Looking South
Boiler - Looking East
Boiler - Looking North
Boiler-East Side - Looking Northwest
Mill Side_16M Level Metal Decking for Concrete Slab - Looking East
Boiler-West Side-Coal Pipes and Hot Air Manifold Installation - Looking West
Boiler_Pre-Fabrication Area Pressure Parts - Looking Southwest
Main Transformer Area - Looking North
Steam Turbine Hall-South Side-Cooling Water Pipe Saddle - Looking East
Phase 3_ Cooling Water Pipe Saddle - Looking Southeast
Steam Turbine Hall-Structural Steel and Column upto Table- Looking West
Steam Turbine Hall-Structural Steel - Looking Northwest
Steam Turbine Hall-West of Condenser Area - Looking West
Central Electrical Building - Looking Northeast
MCW Saddle -Bet. New HV Line and Aeration Basin - Looking South
Phase 4 SWFGD_GRP-Base Preparation - Looking Northeast
Stacker Reclamer-East Side -South of Boiler Laydown Area - Looking North
Stacker Reclamer-East Side -Inside of Boiler Laydown Area - Looking North