20.10.2014

Boiler east view
Boiler cavity
N2/CO2 gas bottles
Boiler tripper floor
Boiler tripper floor
Boiler tripper floor
Boiler tripper floor
Boiler tripper floor
Boiler
Boiler
Boiler 59m level
Boiler fire fighting pipe 59.0m level
Boiler 81.0m level
Boiler 81.0m level scaffolds for spacer tube placement
Boiler 81.0m level scaffolds for spacer tube placement
Boiler 81.0m level scaffolds for spacer tube placement
Boiler 81.0m level scaffolds for spacer tube placement
Boiler 81.0m level scaffolds for spacer tube placement
Boiler access road preparation
Tanks view
Service and Fire water tanks
Demin plant
FGD south view
Fabric filter roof top view
Transfer towers
Coal conveyor BC-07
Bottom ash conveyor
Industrial waste water treatment plant