View from MNG 3 Boiler 
Client HV switch yard 
 Laydown Area & Stacker Re-clamer erection
Coal Transfer towers steel erection and Conveyor steel pre-assmebly 
STH - Table Top
 STH south end
 Last 2 LP heaters 8m lvl
Keyblock welding for last 2 Bearing pedestals

IPB
IPB
 CEB cable cellar
 CEB cable cellar
 MV switch Room 4m lvl
MV switch Room 4m lvl 
 MV switch Room 4m lvl
 Battery Room 10m lvl
  Battery Room 10m lvl
 UPS room 10m lvl
  UPS room 10m lvl
 LV room 10m lvl
 DCS room 16m lvl
 CEB stairwell internal plastering
Control Room 20m lvl 
 Control Room 20m lvl 
CEB Transformers
 Absorber/Reactor
STH westside
 CEB west side
Boiler PA fan east side 
Boiler FD fan east side 
Boiler Cavity 
 Boiler Lower furncace
 Booster fans
Booster fans
Fabric Filter 
 Fabric Filter 
 Raw water road crossing
 Raw water run to run water tanks
Firefighting pump ststion 
Piperack 2
 MCWPH northend
 MCWPH cavity
 MCWPH cavity
 MCWPH southend
Existing ash conveyor temp works 
 Raw water tanks
Demin plant
MCW southeast of STH