27.07.2013


 MCWPH north end
MCWPH south end 
Electrochlorination building 
MCW ash conveyor crossover 
 FWP baby Turbine No.2
HO heaters 8m lvl 
 Condenser
ST Valve 
 IPB
 CEB control room
 HP piping
Fire Fighting deluge system 
Fire fighting U/Gs 
 Lub oil room
 Fabric Filter/FGD Elec Building 
FGD ducting 
Absorber/Reactor tower 
Bottom Ash and Fly Ash towers 
Demin plant 
Raw/Fire water tanks 
Raw water U/Gs 
 Raw water U/Gs 
MCW east of STH 
 K11
 Boiler ash hopper assmebly
Stacker reclaimer material and assembly area
Transfer tower no. 14  
 Coal handling Control room(north end)
 Transfer tower no. 10 & Conveyor
Transfer tower no. 11  
Transfer tower no. 14 2