30.03.2013

Power Block Northeast Side

Boiler - North Side

Boiler Backpass Hanger Rods Support Structure

Boiler - Area 2

Boiler - Coal Piping

STH - Roof Installation and Overhead Crane

STH - ST/Gen Table - Looking West

CEB - Cabling Works in progress - 0m level
 
CEB - 10m level
 
CEB Switchgear Room - 10m level

CEB - Auxilliary Transformer (BBT)

Main Transformer Area - Looking East

Main Transformer Area - Looking East

FGD_RGP and MCW Pipes - Looking Southeast

Aeration Basin and CW Discharge Trench - Looking Southeast
 
FGD Aeration basin

FGD Aeration basin

CW Discharge Trench

Fly-ash Silo Foundation

Service/Fire/Potable tank foundation - looking east

Demin Water Plant Foundation

FGD Area - Northside

FGD Area - Southside

FGD Electrical Building

Cooling Water Pumphouse

Manjung 4 BOP Area and Land Reclaimation Works
Manjung 4 Project