Power Block Northeast Side |
Boiler - North Side |
Boiler Backpass Hanger Rods Support Structure |
Boiler - Area 2 |
Boiler - Coal Piping |
STH - Roof Installation and Overhead Crane |
STH - ST/Gen Table - Looking West |
CEB - Cabling Works in progress - 0m level |
CEB - 10m level |
CEB Switchgear Room - 10m level |
CEB - Auxilliary Transformer (BBT) |
Main Transformer Area - Looking East |
Main Transformer Area - Looking East |
FGD_RGP and MCW Pipes - Looking Southeast |
Aeration Basin and CW Discharge Trench - Looking Southeast |
FGD Aeration basin |
FGD Aeration basin |
CW Discharge Trench |
Fly-ash Silo Foundation |
Service/Fire/Potable tank foundation - looking east |
Demin Water Plant Foundation |
FGD Area - Northside |
FGD Area - Southside |
FGD Electrical Building |
Cooling Water Pumphouse |
Manjung 4 BOP Area and Land Reclaimation Works |
Manjung 4 Project |
No comments:
Post a Comment