08.10.2012

 Chimney @ 38.5M Ht. - Looking South
 Chimney @ 38.5M Ht. - Looking Northwest
  Absorber Area - Looking South
 Phase2_SWFGD_GRP-West of Chimney - Looking South
  ID Fans West Side- Excavation - Looking South
  ID Fans East Side- Excavation - Looking Southwest
  Booster Fans - Looking Southeast
 FGD Duct Support Fdn. bet. FF and Boiler - Looking Northwest
  Cable Pull Pit #8 South/West Corner of FF - Looking East
Fabric Filter -East Side- Looking Northwest
  Boiler Electrical Building - Looking Northwest
  Boiler and Fabric Filter - Looking South
  Boiler-Cavity Area - Looking South
 Boiler-West Side - Looking Southeast
   Boiler-East Side - Looking Northwest
 Boiler-Coal Silo F & G Barrel Installation - Looking Northwest
  Main Transformer Area - Looking Northwest
  Cooling Water Pipe Saddle-Phase 3 - Looking Southeast
 Steam Turbine Hall-East Side - Looking South
 Cooling Water Pipe Saddle North Side of STH- Looking West
  Steam Turbine Hall-Structural Steel and Column upto Table- Looking West
   Steam Turbine Hall-Structural Steel - Looking East
 Steam Turbine Hall-West of Condenser Area - Looking East
  Central Electrical Building - Looking West
  MCW Pipe Saddle Area North of New HV Line Excavation - Looking West
 MCW Pipes-Beneath New HV Line and FGD_GRP Phase 4 - Looking Northeast
CW Pipe Saddle -Bet. New HV Line and Aeration Basin - Looking South