10.09.2012

Morning Safety Tool Box Meeting of Eversendai and Equator on Site
 Morning Safety Tool Box Meeting of Equator on Site
Morning Safety Tool Box Meeting of Eversendai  on Site

 Chimney - Looking West
 Chimney Inside Windshell - Looking South
 Phase2_SWFGD_GRP-West of Chimney - Looking North
Phase2_SWFGD_GRP-West of Chimney - Looking Northeast
 Phase2_SWFGD_GRP-West of Chimney - Looking West
  ID Fans East Side- Excavation - Looking South
 Fabric Filter -East Side- Looking Northwest
 Boiler Electrical Building - Looking Northeast
  Boiler-Cavity Area - Looking South
 Boiler-West Side - Looking Southeast
  Boiler-East Side - Looking Northwest
 Mill Side_@ 16M Level Metal Decking for Concrete Slab - Looking West
  BOP Area-Spun Piling-East Side of Boiler - Looking Northeast
  Main Transformer Area-Excavation - Looking Northwest
 Steam Turbine Hall-South Side-Cooling Water Pipe Saddle - Looking East
  Phase 3_ Cooling Water Pipe Saddle Saddle - Looking Southeast
  Condensate Make Up Tank - Looking East
   Steam Turbine Hall-Structural Steel North Side - Looking Southeast
  Steam Turbine Hall-East Side - Looking North
  Steam Turbine Hall-Column upto Table - Looking Northwest
   Central Electrical Building @ Elev. 4.0M - Looking Northeast
 Central Electrical Building @ Elev. 4.0M - Looking North
 CW Pipe-Beneath New HV Line - Looking North
 CW Pipe Saddle -Bet. New HV Line and Aeration Basin - Looking South
  Phase 4 SWFGD_GRP-Base Preparation - Looking East
Screening House-Spun Piling Works - Looking North