23.08.2012

  Pan View_Phase2_SWFGD_GRP-North of Chimney - Looking East
Pan View_Steam Turbine Hall-East Side - Looking West

 Phase2_SWFGD_GRP-West of Chimney - Looking West
 
 Chimney - Looking North
  Boiler Electrical Building - Looking North
 Fabric Filter -West Side- Looking Southeast
Fabric Filter -East Side- Looking Northwest
  Boiler-East Side - Looking Southwest
 Boiler-West Side - Looking Southeast
  Boiler-West Side - Looking Northeast
  Boiler-East Side - Looking Northwest
  Boiler and Steam Turbine Hall-South Side - Looking North
 Boiler and Fabric Filter - Looking South
  Steam Turbine Hall-East Side - Looking South
  Steam Turbine Hall-East Side - Looking East
   Steam Turbine Hall-Structural Steel North Side - Looking Southeast
 Condensate Make Up Tank - Looking East
  BOP Area-Spun Piling-East Side of STH - Looking Southeast
  Phase 3_MCW-Excavation Works- Looking Northwest
  Main Transformer Area-Spun Piling Works  - Looking West
  Central Electrical Building - Looking Northeast
 Central Electrical Building - Looking Southwest
Cooling Water Pumphouse - Remaining 3 nos. of Pre-cast Culvert  
Cooling Water Pumphouse - Looking Northwest