28.08.2012

  Pan View_Phase2_SWFGD_GRP-North of Chimney - Looking East
 Pan View_Steam Turbine Hall-East Side - Looking West
 Aerial View_BEB, FF, Chimney and SWFGD_GRP P2 - Looking North
 Aerial View_Chimney - Looking North
Chimney - Looking South
Phase2_SWFGD_GRP-West of Chimney - Looking Northeast
Phase2_SWFGD_GRP-West of Chimney - Looking North

   Aerial View_SWFGD_GRP P2 - Looking North
  Aerial View_Fabric Filter - Looking North
  Aerial View_Boiler Electrical Building - Looking Northeast
  Boiler-East Side - Looking Southwest
  Boiler-Cavity Area - Looking South
  Boiler-East Side - Looking Northwest
  Boiler and Steam Turbine Hall-South Side - Looking North
 Boiler-East Side-Duct Riser, Coal Pipes and Flatform & Railings Installation - Looking West
Boiler-West Side-Ducting Installation - Looking Southwest

   Steam Turbine Hall-Structural Steel North Side - Looking North
    Steam Turbine Hall East Side- Looking East
 Aerial View_Steam Turbine Hall-East Side - Looking South
 Phase 3_MCW-Excavation Works- Looking Northwest
 Steam Turbine Hall-South Side-Cooling Water Pipe (CWP) Saddle - Looking East
  BOP Area-Spun Piling-East Side of STH - Looking Southeast
  Main Transformer Area-Spun Piling Works  - Looking West
  Central Electrical Building - Looking Northwest
 MCW-Bet. New HV Line and Aeration Basin - Looking North
Reclamation by Aeration Basin - Looking South