17.08.2012

  Pan View_Phase2_SWFGD_GRP-North of Chimney - Looking East
Pan View_Phase2_SWFGD_GRP-West of Chimney - Looking North
  Aerial View_Steam Turbine Hall - Looking South
Phase2_SWFGD_GRP-North of Chimney - Looking West
 Phase2_SWFGD_GRP-West of Chimney - Looking East
 Aerial View_Chimney - Looking North
  Aerial View_Boiler Electrical Building - Looking North
 Booster Fans - Looking Southeast
Fabric Filter -West Side- Looking Southeast
Fabric Filter -East Side- Looking Northwest
  Boiler-East Side - Looking Southwest
  Boiler-Cavity Area - Looking South
   Boiler-West Side - Looking Southeast
   Boiler-West Side - Looking Northeast
   Boiler-East Side - Looking Northwest
  Boiler and Steam Turbine Hall-South Side - Looking North
  Boiler and Fabric Filter - Looking South
 Boiler- Coal Pipes and Walkways Installation
 Boiler- Walkways Installation
 Steam Turbine Hall-East Side - Looking South
 Aerial View_Steam Turbine Hall-Prep'n for Main Column Erection - Looking Southwest
 Condensate Make Up Tank - Looking East
  Phase 3_MCW-Excavation Works- Looking Northwest
 Main Transformer Area-Spun Piling Works  - Looking West
 BOP Area-Spun Piling Works-East Side of STH - Looking Southeast
 Central Electrical Building - Looking Northeast
 Central Electrical Building - Looking Southwest